THUNDER BAY – The walkway is re-opened. Repairs to the framed glass panels on the Water Street Pedestrian Overpass are now complete. The structure has been inspected and deemed safe. Water Street and the Overpass are now open to traffic.
It has been repaired and inspected, and will continue to be monitored on a regular basis
A framed glass panel on the Water Street pedestrian overpass was found detached during a routine scheduled cleaning on Friday, May 16. The structure along with Water Street was closed as a safety precaution.
The Firefighters 10 Mile Road Race will not detour, and will proceed along its original route.